Applicants should contact the NYC DOT Plan Examination Unit (PEU) of the Permit Office to initiate the application process and to determine specific requirements for a permit and a license, if required. Applicants have two options to acquire an emergency street opening/excavation permit. FLAG PERSON MUST BE PROVIDED TO STOP PEDESTRIAN AND/OR VEHICLE TRAFFIC WHILE LIFTING MATERIALS OVERHEAD AND ALSO WHEN CROSSING SIDEWALK IN CONJUCTION WITH CROSSING SIDEWALK PERMITS. Any emergency work on a street that involves opening a utility access cover to gain access to an underground facility on a critical street during restricted hours requires an EAN. MUST TINT CONCRETE TO MATCH ASPHALT. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. (IV) FIVE FEET OF RAIL ROAD TRACKS. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which summonses/NOVs may be issued.). MAINTAIN 5 FOOT PED. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. StatenIsland.Forestry@parks.nyc.gov It seems that JavaScript is not working in your browser. Fax: (718) 699-7491 font size. The applicant must maintain valid insurance and a canopy maintenance permit as long as the canopy exists. Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. PERMITTEE MAY ALSO OCCUPY ONE TRAVEL LANE ADJACENT TO EAST CURB LANE 830PM TO 4:30AM.NIGHTLY FROM 10/4 THROUGH 10/15. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. CONTAINMENT ONLY TO RESTRICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR SPECIFIC TRAVEL LANE RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Longitudinal SlopeThe longitudinal slope of the sidewalk must be uniform and parallel to the curb at the curb's proper grade. New York City Department of Transportation AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. 2016 CT.gov | Connecticut's Official State Website, regular
Send corrections and additions to the Standard Drawings team. This New York 811 marking shows where a cable television line is located beneath the sidewalk. It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. OCMC will review the project to determine if a Community Reassessment Impact and Amelioration (CRIA) statement must be submitted to NYC DOT. Staten Island NY 10301 The ASHO in each borough releases Capital Project In-House (CPI) holds and Street Arterial Maintenance (SAM) holds. Brooklyn It is essential to call New York 811 before digging anywhere, including sidewalks and soil. Applicants must submit a completed permit application. 6. CONTRACTOR MUST NOTIFY THE ALLIANCE FOR DOWNTOWN NEW YORK 120 BROADWAY SUITE 3340 NEW YORK, NEW YORK 10271 212-566-6700, AT LEAST 3 BUSINESS DAYS PRIOR TO STARTING WORK. PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED. Kew Gardens, NY 11424 Fax: 718-556-7305, The Bronx New York, NY 10007 A sample of an acceptable Certificate of Insurancecan be viewed here and in Appendix B. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure. 1400 Williamsbridge Road, 2nd Floor Check traffic advisories. Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BUILDING LINE TO BUILDING CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Canopy authorizations and permits are required to place a canopy over the sidewalk. In addition, a vault license from NYC DOT's Office of Franchises, Concessions and Revocable Consents is required to construct a new building vault or enlarge an existing building vault. If the permit has been expired for more than30 days, a new permit application must be submitted. Fax: (718) 965-7753 Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. 24 West 61st St., 5th Fl. CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF ANY OTHER JURISDICTION SUCH AS PRIVATE PROPERTY, STATE, FEDERAL ETC., IT IS THE PERMITTEES RESPONSIBILITY TO DETERMINE THE PROPERTY OWNER AND OBTAIN THE WRITTEN APPROVAL. THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. Queens Manhattan.Forestry@parks.nyc.gov NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT RED LIGHT CAMERA UNIT TO OBTAIN THE CONSTRUCTION AND MARKINGS PLANS FOR THIS WORK AREA. WORK SATURDAY AND SUNDAY. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. Tel: 718-286-3170 THIS STIP IS USED FOR WORK IN A TRAVEL LANE. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN, ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). (718) 391-1937 Information on the restoration requirements for sidewalk repairs can be found inChapter 4 Executing Work in the Street. Fax: (718) 993-3077. COLORED ROADWAY AND OR SPECIAL MARKINGS ARE LOCATED ON THE ROADWAY OF YOUR PROPOSED WORK AREA. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. Tel: 212-720-3300 If the location is deemed suitable, HIQA signs the Canopy Authorization Form indicating HIQA approval and returns it to the applicant. Permits (hazardous storage/operations) (718) 999-2457, New York City Department of Information Technology and Telecommunications (DoITT) Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. Abuilding vault, as described in Section 2-13 of the Highway Rules, is any opening below the surface of the street that projects outside of the property line and is covered over, except for those openings: (1) used exclusively to access, by means of steps, the cellar or basement of any building; (2) used primarily for light and ventilation; (3) constructed or maintained by utility companies (including transformer vaults); and (4) which are subways, railroads and related structures. Office hours: 8:30 AM-3:30 PM (in person) Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. Capital Project by Other Agency (CPO) hold A CPO hold is automatically placed if the proposed permit location involves a current capital street reconstruction project or one that is being planned. Application for a canopy installation involves three major steps. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 Tel: 311 or (718) 422-8700, Public Design Commission of the City of New York (PDC) If no changes are required, the permit will be released. A full sidewalk accommodates both pedestrian traffic and a range of street furnishings and fixtures. 16 Court Street, 7th Fl. Several forums are in place to provide advance notice of city capital projects. At the foundation of the city that never sleeps lays a network of streets that helps keep New York and New Yorkers moving forward. BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. AS PER STIPULATION MEC04-246 AND PROJECT PLANS DATED 04/30/04 WHICH MUST BE ATTACHED TO PERMIT. A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. Report a problem. Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. Customer Service: (718) 802-3675, Manhattan STANDARD SHEETS (METRIC) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (Metric) > 619 Maintenance and Protection of Traffic Note: Effective May 2017 no new or updated versions of Metric Standard sheets will be published. 130 Stuyvesant Place, 6th Fl. The completed Permittee Registration Application and other required documents must be submitted in person to the NYC DOT central Permit Office to complete the registration process. PHONE#508-429-6023. Attn: Forestry The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. Tel: (212) 788-3071 Access the, If the applicant intends to fully close a roadway, a. Customer Service: (718) 579-6920, Brooklyn NYC DOT is working to enhance the coordination of major planned work that impacts the streets with utility companies and other entities that perform street excavations. (646) 892-1388/1389 Upon satisfactory payment, the hold(s) will be released. NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. MAXIMUM OF 11 FEET OF ROADWAY MAY REMAIN CLOSED AFTER WORKING HOURS ONLY FOR CONCRTETE CURING. FLAGGERS ARE REQUIRED FOR ALL MOVEMENTS IN AND OUT OF SITE AT ALL OTHER TIMES. Canopy (CAN) hold A CAN hold is automatically placed on a canopy maintenance permit application until a HIQA inspector performs a final inspection confirming the submitted plans. Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. More specific information on each permit type, including application procedures and fee structures are described in greater detail in Section 3.3 The Permit Application Process of this chapter. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. Applications for most permit types can be submitted to the Manhattan Central Permit Office. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. (212) 839-2387/88/89 Worker's Compensation Insurance. The applicant will be charged a fee of $30 for each utility access cover opening EAN. Other conditions may apply, such as a variation in the distance and width of the job, which may increase the fee required. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. Permits may be voided and reissued only within three business days of issuance. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. A collection of manuals, specifications, and other publications relevant to the Office of Traffic Operations. The contact information and hours of operation can be found in Appendix C, NYC DOT Contact Information. Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. If there is no hold, the permit is issued to the applicant after appropriate payment is received. WORK HOURS 7 AM - 10 PM MON-FRI, AND 8 AM - 10P M SATURDAY, AND 9 AM TO 10 PM SUNDAY. View more information and instructions for obtaining a revocable consent. New York, New York 10041. If a contractor is being used, the contractor must be registered with NYC DOT and must take out the permit. Street Opening, Building Operations/Construction Activity, Sidewalk Construction, and Canopy Permits are reviewed and stipulated by OCMC staff. The Bronx The maximum transverse slope permitted for vault covers, gratings and other sidewalk structures is 1" in 5'. Unauthorized removal of muni-meters is prohibited. 233 Schermerhorn Street, 11th Floor Any foundation material not meeting specifications must be removed. If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. WORK 9 AM TO 7 PM EXCEPT SUNDAY. Tel: (718) 875-7428 FULL INTERSECTION RESTORATION WILL BE REQUIRED. To this end, the Street Works Manual is a resource for all parties that perform work in New York City streets, from utilities and contractors installing, replacing and repairing underground infrastructure to developers replacing roadways and sidewalks adjacent to building sites and homeowners performing their own sidewalk repairs. Email: DOT.TrafficElectrical@ct.gov,
ON WEEKDAYS FROM 6AM TO 7PM MUST WORK BEHIND BARRIER WHILE MAINTAINING HALF SIDEWALK (MIN 5 FEET) FOR PEDESTRIANS AND NO USE OF ROADWAY. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND,YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. If the proposed location may be suitable, HIQA performs an inspection in order to confirm its suitability. If a permit is about to expire and the permittee has not completed the work, the permittee must apply for a permit renewal as all work must be performed pursuant to an active permit at all times. To this end, NYC DOT has dedicated time and resources to enhance its own systems and coordination efforts. ANY STORAGE OF MATERIAL OR STORAGE OF EQUIPMENT REQUIRES A SEPARATE PERMIT. WORK 7PM TO 11PM MON. CGL insurance. New York State law (Article 36 of General Business Law and 16 NYCRR Part 753, AKA Industrial Code 53) requires excavators to contact New York 811, via 811, 800-272-4480 or the internet, within 2 to 10 working days before performing any digging or excavation work. The Highway Rules, Section 2-02(k) contains additional information. Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. A CRIA statement is required if the closure is expected to last for more than 180 consecutive calendar days, as set forth inSection 2-16 of the Highway Rules. Concrete (CON) hold All permits issued to work on concrete portions of the roadway are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE. HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. 16 Court Street, 16th floor AN EMBARGO WILL BE IN EFFECT FOR THIS WORK AREA FROM 7/28/14 THRU 8/16/14 ALL ROADWAY/SIDEWALK OPENINGS WHICH CANNOT BE COMPLETED INCLUDING BACKFILL AND RESTORATION PRIOR TO 7/28/14 SHOULD NOT BE STARTED. At that point, OCMC executive staff will determine if additional permit stipulations are required. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The second option is available for applicants who do not have the technology to use the above procedure. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. To this end, this chapter discusses existing mechanisms that help inform utility companies and other potentialstreet excavatorsof impending NYC DOT work, including how to access information on NYC DOT's planned capital projects, weekly street resurfacing schedules, "protected street"*information and other data that can help to facilitate effective communication regarding street work. Tel: 212-720-3480 This category of permits applies to construction-related activities that take place within the street and are generally associated with construction work adjacent to the street. Expanding on thesmall sampling of recommended plants listed in previous versions of the Street Design Manual, DOT is now introducing its Plant Finder tool, offering a broadened database of plants that have been successfully used within the public right-of-way. THIS EXECPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT. AS COORDINATED WITH COMMUNITY BOARD, CON ED. WORK SOUTHBOUND 9AM-6PM M-F AND 9AM-6PM SAT/SUN. ONLY FOR CORRECTIVE ACTION FOR SPECIAL EVENTS. WAIVER TO WORK DURING 2010 HOLIDAY EMBARGO GRANTED FOR THIS PERMIT. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. Each canopy maintenance permit expires one year after the date of issuance, unless revoked sooner by NYC DOT. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. 95 Prospect Park West New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . Additional requirements are contained in Sections 2-02 and 2-09 of the Highway Rulesand should be consulted before any work is performed on the street. These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). Further information on insurance and bonds is available in Chapter 3 Permits and Approvals and in Section 2-02(a) of the Highway Rules. CONNECT WITH US. THIS STIP IS USED FOR SINGLE CUTS IN THE CURB/PARKING LANE. All applicable fees will apply. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. 59 Maiden Lane, 37th floor NYC Parks & Recreation CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. NYC DOT disclaims any liability for omissions or errors that may be contained herein. FIVE OR MORE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. WORK SOUTHBOUND ONLY. WORK SHALL BE PERFORMED IN ACCORDANCE WITH NYCDOT'S SPECIAL EVENTS OFFICE REQUIREMENTS RELATED TO A SPECIAL EVENT, AS IDENTIFIED IN THEIR EMAIL, WHICH MUST BE KEPT ON-SITE WITH ALL ACTIVE PERMITS WHILE THE APPROVED WORK IS BEING PERFORMED. Kew Gardens, NY 11424 Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 619 Work Zone Traffic Control 619 SHEETS EFFECTIVE BEFORE LETTING OF MAY 1, 2022 ARE AVAILABLE IN THE TABLES BELOW Notes: 1. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. (212) 839-2480 Attn: Forestry To have the hold released, the permittee must correct the unsafe condition, and then contact HIQA to arrange for an inspection. COORDINATE WITH NYSDOT PRIOR TO WORK. 30-30 Thomson Avenue, 4th Floor The applicant must obtain CGL insurance policies written by companies that may lawfully issue such policies, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. WALKWAY MUST BE RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY. Any of these holds will prevent a permittee from applying for new permits: New York City Department of Finance (DOF or Finance) hold If a permittee has failed to pay previously issued summonses/Notices of Violation (NOVs) to the New York City Environmental Control Board (ECB), all future permit requests may be placed on hold until the fees associated with the outstanding summonses/NOVs are paid. Standard Sheets (US Customary) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) US Customary Standard Sheets Standard Sheets are available both in the US Customary units accessible below and in Metric units. DURING RESTORATION SAW CUTTING IS REQUIRED AS PER DRAWING H-1042A, THE PERMITTEE IS NOT PERMITTED TO ENTER, OCCUPY OR USE ANY PUBLICLY-OWNED OR PRIVATELY OWNED, NON-PAVED, LANDSCAPED OR NON-LANDSCAPED LOCATION WITHOUT SPECIFIC WRITTEN PERMISSION. Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. VERMEER CUT OF TRENCH. OCCUPY 12 FOOT WIDTH OF ROADWAY; FULL WIDTH OF ROADWAY RESTORED TO TRAFFIC WHEN SITE IS UNATTENDED. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. Brooklyn, NY 11241-0103 Division of Review & Construction Compliance (718) 595-5223 or Upon receipt of the above and verification for completeness, a Sidewalk Repair Permit will be issued and mailed to the applicant. Some of the features on CT.gov will not function properly with out javascript enabled. These holds can only be released by OCMC executive staff. With over 185,000 corners, the Pedestrian Ramp Program is a robust program focused on installing and upgrading pedestrian ramps (curb ramps) throughout the five boroughs. For building operations, a crane permit is required for all cranes and derricks operating in the street on building construction or related activity under the jurisdiction of DOB, with the exception of truck cranes with telescopic, hydraulic or folding booms, over 50 feet and not more than 135 feet with a maximum rated capacity of 3 tons, for which a construction activity permit has been issued. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. 10 Richmond Terrace, Room 308 The area of the sidewalk closest to the curb, where light poles, tree pits and other vegetation, signs, fire hydrants, and street furniture are typically located, is referred to as the furnishing zone.. Applications for renewal of a canopy maintenance permit must be made at least one month prior to the permit expiration date and must be submitted to the Permit Office in the borough in which the canopy is located. All Street Opening permit types usually allow for work within 300 linear feet by a width of 12 feet. Unsafe Conditions If the permittee has been notified and fails to address an unsafe condition, all future permit requests may be placed on hold until the unsafe condition has been eliminated. The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. 120-55 Queens Boulevard The second permit for canopy maintenance is automatically placed on a. Vault (VLT) hold A VLT hold is automatically placed if the proposed permit work is for the installation or repair of a vault, which must be reviewed and released by the Permit Office. After the canopy passes final inspection, HIQA will release the hold and the applicant must return to the Permit Office to obtain the permit to maintain the canopy. NO EQUIPMENT/MAT'L MAY BE PLACED ON TOP OF SENSORS. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. MUST BE AN UNRESTRICTED PARKING LANE.