1671 . Warning System for Mobile Equipment
A warning system shall be used when mobile equipment is operated adjacent to the edge of an excavation if the operator does not have a clear and direct view of the edge of the excavation. Underground Installations
The location of sewer, telephone, fuel, electric, water, or any other underground installations or wires that may be encountered during excavation work shall be determined and marked prior to opening an excavation.
DOC Sample Written Program - Texas Department of Insurance Materials and equipment may, as determined by Responsible Person , need to be stored further than two (2) feet from the edge of the excavation if a hazardous loading condition is created on the face of the excavation.
CORPORATE QHSE - Easa Saleh Al Gurg Group - LinkedIn A Falls Emergency Rescue Plan is a pre-planned procedure for safely retrieving someone who has fallen from a height and is suspended in a harness. Chemical, biological, or radiological contaminants may be released into the environment in such quantity and/or proximity to a place of business that it is safer to remain indoors rather than to evacuate employees. If the competent person cannot assure that the material or equipment is able to support the intended loads or is otherwise suitable for safe use, then such material or equipment shall be removed from service. }=Xy'av }O_ $} Retraining will be performed when work site inspections indicate that an employee does not have the necessary knowledge or skills to safely work in or around excavations, or when changes to this program are made. Design of Sloping and Benching Systems
The slope and configuration of sloping and benching systems shall be selected and constructed by Responsible Person in accordance with the following options:
Allowable configurations and slopes
Excavations shall be sloped at an angle no steeper than one and one-half (1 ) horizontal to one (1) vertical (34 degrees measured from the horizontal), unless one of the options listed below is used.
PDF TRENCH RESCUE OPERATIONS - Phoenix, Arizona Look for standing water or atmospheric hazards. the project and plays a key role in their training and approval of . You need a plan of action for yourcrewsto follow in the event of afall. Over 15 years of professional experience in HSE at fabrication of fixed oil and gas onshore construction industry and HSE fabrication management, HSE administrative & system development experience in the manufacturing oil and gas industry, work in maritime shipyard company, EPC company and now active in power plant project company.<br><br>High qualification of HSE management System, Project . TRAINING
Training Schedule
All personnel involved in trenching or excavation work shall be trained in the requirements of this program by Responsible Person with assistance from the appropriate supervisors. Protection from Falling Objects and Loose Rocks or Soil
Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. A rapid rescue is essential for preventing secondary injuries, and even death, that can occur in a fall incident, even after the danger of a direct falling injury has passed. 0000015503 00000 n
PDF Trench Rescue Technician Training Safety Plan - cmcpro.com Adequate precautions shall be taken to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres.
PDF Sample Fall Protection Plan - OSHAcademy Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. Design by a registered professional engineer
Support systems, shield systems, and other protective systems designed in a manner other than the preceding three options shall be approved by a registered professional engineer. Occupational Safety and Health Act of 1970 "To assure safe and healthful working conditions for working men and women; by authorizing enforcement Jabiru, Northern Territory, Australia. .
EXCAVATION EMERGENCY RESPONSE PLAN - Crowsnest Pass, Alberta Hazardous Atmospheres
Responsible Person will test the atmosphere in excavations over four (4) feet deep if a hazardous atmosphere exists or could reasonably be expected to exist. Provide technical assistance as needed. 0000012443 00000 n
The list is meant to assist construction employers and does not detail all Cal/OSHA requirements.
Excavation Safety Hazards & OSHA Standards | SafetyCulture Personnel Working at Heights Need a Fall Rescue Plan - Weeklysafety.com In addition:
Any atmospheric testing instrument that has not been used within 30 days shall be recalibrated prior to use. Slopes shall be properly excavated depending on soil type as shown in 29 CFR 1926, Subpart P, Appendix B. 0000027609 00000 n
!IgC87>MxB:x9EPq(s=~:Ifuk [3>pta23< Surface Encumbrances
All equipment, materials, supplies, permanent installations (i.e., buildings or roadways), trees, brush, boulders, and other objects at the surface that could present a hazard to employees working in the excavation shall be removed or supported as necessary to protect employees. In REThink Hand Safety, the most comprehensive book on hand safety, you'll learn how top companies have reduced hand injuries by up to 90% and what the most successful hand safety programs have in common. If possible, the grade should be away from the excavation. 0000030910 00000 n
Excavation Safety is a standardized set of safety precautions for trenching and excavation to eliminate hazards and control risks in compliance with regulations.
The use of personal protective equipment that will typically be required during work in excavations, including but not limited to safety shoes, hardhats, and fall protection devices. Each employee working at the edge of an excavation six (6) feet or more deep shall be protected from falling.
0000027490 00000 n
A Fall Protection Plan for Confined Space Rescues Exposure to vehicular traffic. e These precautions include providing proper respiratory protection or ventilation in accordance with subparts D and E of this part respectively. Hazardous atmosphere: an atmosphere that is explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, that may cause death, illness, or injury. ASSIGNMENT OF RESPONSIBILITY
Employer
In administering the Excavation Safety Program, Company Name will:
Monitor the overall effectiveness of the program.
Md Fajar S - Senior Emergency Responder / HSE Advisor - ExxonMobil 1. 0000027758 00000 n
Find the right safety gloves for your team and try before you buyin just 3 easy steps! Q82+O+_){fAJKq$q6Vh e*QYkwJQ82:N(-O:Z\]] t All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees. 0000066930 00000 n
Added/Updated: 03/01/23 Solicitation Title: *UPDATED* IFB - American Rescue Plan - Water and Sewer Project Package 3 Scope: Work includes approx 0.8 AC site clearing and striping; 1,211 LF trench excavation safety protection; 7 SY removal and replacement of HMA concrete pavement; 23 SY HMA concrete pavement overlay (2" TY D); 4 EA 4' fiberglass manhole (wastewater); 1 EA 5' fiberglass manhole . 1926.1211 - Rescue and emergency services. 1926, Subpart P
Table of Contents
Excavation Safety Program
Objective
Assignment of Responsibility
Employer
Program Manager
Employees
Training
Training Schedule
Training Components
Training and Duties of Program Manager
Excavation Requirements
Utilities and Pre-Work Site Inspection
Surface Encumbrances
Underground Installations
Protection of the Public
Protection of Employees
Exposure to Vehicular Traffic
Exposure to Falling Loads
Warning System for Mobile Equipment
Hazardous Atmospheres
Personal Protective Equipment
Walkways and Guardrails
Protection from Water Accumulation Hazards
Stability of Adjacent Structures
Protection from Falling Objects and Loose Rocks or Soil
Inspection by Program Manager
Protective System Requirements
Protection of Employees
Design of Sloping and Benching Systems
Design of Support, Shield, and Other Protective Systems
Materials and Equipment
Installation and Removal of Supports
Sloping and Benching Systems
Shield Systems
Accident Investigations
Changes to Program
Glossary
Excavation Safety Program
for
Company Name
OBJECTIVE
This Excavation Safety Program has been developed to protect employees from safety hazards that may be encountered during work in trenches and excavations.
PDF Environmental Safety, Sustainability & Risk Activating the Excavation Emergency Rescue Plan and Emergency Response Team (i.e. These inspections are only required when the trench will be or is occupied by employees. PAGE
PAGE 22
2 ; [ @ ,
8
e x { , : T &.
Creating a Confined Space Rescue Plan: Every Step You Need - Safeopedia